If 3/5 of a job can be completed in 6 weeks how long will it take to complete the entire job working at the same rate

Answer :

awhkas
6/3= 2
So 1/5th of the job is done in 2 weeks
So 2 x 5= 10
It’s takes 10 weeks to complete the whole job at the same rate