Answer :
Inez is still obligated to accept delivery of the boat because it is still the boat that she contracted out and built to the specifications that she requested. Just because it was contracted out to another company doesn't mean that she didn't get what she wanted for the price she wanted. If she didn't have a specific design then she might have an argument, however she did and it was built to that design specs.